Finally they've started work (several months ago) on the new Chiang Khong bypass to the west of town.
This bypass will greatly reduce the volume of trucks using Chiang Khong city with a link up to the bridge & no need for vehicles coming from the North to drive through town.
At the northern end it starts here
At the southern end it links up near here
And should link up with the bridge road.
The estimated construction period is 3 years.
The project is long over due & will be convenient for the high speed train project.
The high speed train to Chiang Khong
Some interesting info on the high speed train
Three contractors for Denchai - Chiang Rai - Chiang Khong are:
Contract 1 : Denchai - Ngao including the new station building for Denchai and Ngao station (103 km with the mean price of 26,599.16 million Baht) - Italian Thai Development PCL (ITD) and Naowarat Phatthanakarn PCL (NWR) won the bidding at 26,568 million Baht.
Contract 2: Ngao - Chiang Rai without either Ngao station or Chiang Rai station (132 km with the mean price of 26,913.78 million Baht) - Ch. Karnchang PCL (CK) - Sino-Thai Engineering and Construction PCL (STECON) won the bidding at 26,900 million Baht.
Contract 3: Chiang Rai - Chiang Khong including Chiang Rai station (87 km with the mean price of 19,406.31 million Baht) - Ch. Karnchang PCL (CK) - Sino-Thai Engineering and Construction PCL (STECON) won the bidding at 19,390 million Baht.
CK -STECON got 2 contracts for Denchai - Chiang Rai - Chiang Khong Railway project to be done in 2027 including:
Contract 2: Ngao - Chiang Rai (excluding Ngao station and Chiang Rai station) with Ch. Karnchang PCL, Sino Thai Engineering and Construction PCL and Buriram Phanasin Co. Ltd. 132 km with 4 stations 8 halts, 1 railway tunnel and installation of signal and telecommunication with the price tag of 26,890 million Baht
Contract 3: Chiang Rai - Chiang Khong (including Chiang Rai station) with Ch. Karnchang PCL, Sino Thai Engineering and Construction PCL and Chiang Mai Construction Co. Ltd. 87 km with 3 stations 3 halts, 1 railway tunnel and installation of signal and telecommunication with the price tag of 19,385 million Bah
Some links with train info
As much info as you can get in Thai
This bypass will greatly reduce the volume of trucks using Chiang Khong city with a link up to the bridge & no need for vehicles coming from the North to drive through town.
At the northern end it starts here
At the southern end it links up near here
And should link up with the bridge road.
The estimated construction period is 3 years.
The project is long over due & will be convenient for the high speed train project.
The high speed train to Chiang Khong
Some interesting info on the high speed train
Three contractors for Denchai - Chiang Rai - Chiang Khong are:
Contract 1 : Denchai - Ngao including the new station building for Denchai and Ngao station (103 km with the mean price of 26,599.16 million Baht) - Italian Thai Development PCL (ITD) and Naowarat Phatthanakarn PCL (NWR) won the bidding at 26,568 million Baht.
Contract 2: Ngao - Chiang Rai without either Ngao station or Chiang Rai station (132 km with the mean price of 26,913.78 million Baht) - Ch. Karnchang PCL (CK) - Sino-Thai Engineering and Construction PCL (STECON) won the bidding at 26,900 million Baht.
Contract 3: Chiang Rai - Chiang Khong including Chiang Rai station (87 km with the mean price of 19,406.31 million Baht) - Ch. Karnchang PCL (CK) - Sino-Thai Engineering and Construction PCL (STECON) won the bidding at 19,390 million Baht.
CK -STECON got 2 contracts for Denchai - Chiang Rai - Chiang Khong Railway project to be done in 2027 including:
Contract 2: Ngao - Chiang Rai (excluding Ngao station and Chiang Rai station) with Ch. Karnchang PCL, Sino Thai Engineering and Construction PCL and Buriram Phanasin Co. Ltd. 132 km with 4 stations 8 halts, 1 railway tunnel and installation of signal and telecommunication with the price tag of 26,890 million Baht
Contract 3: Chiang Rai - Chiang Khong (including Chiang Rai station) with Ch. Karnchang PCL, Sino Thai Engineering and Construction PCL and Chiang Mai Construction Co. Ltd. 87 km with 3 stations 3 halts, 1 railway tunnel and installation of signal and telecommunication with the price tag of 19,385 million Bah
Some links with train info
Chiang Rai Railway: (Den Chai – Chiang Rai – Chiang Khong)
The Den Chai – Chiang Rai – Chiang Khong Railway is a proposed new railway in Northern Thailand. The railway would branch off from the current Bangkok-Chiang Mai Railway at Den Chai, to…
futuresoutheastasia.com
Northern double-track railway to Mekong to open 2023
CHIANG RAI: Construction of the 323km double-track railway from Den Chai in Phrae to Chiang Khong on the Mekong River border will be accelerated so it can enter service two years earlier, the transport minister announced on Thursday.
www.bangkokpost.com
As much info as you can get in Thai